48hrs
Rapid deployment available
UK Wide
Coverage including remote sites
Unlimited
Usage options available
Managed
Setup and support from experts
Built for the realities of busy construction sites
Construction projects need internet that can be installed quickly, perform reliably and adapt as the site changes. Our solutions are designed for temporary environments where fixed lines are too slow, too rigid or simply unavailable.
Traditional fixed-line broadband can take 6 to 12 months to install through engineering, permitting and physical cabling. We bypass all of that, getting your site fully operational in as little as 48 hours using 4G/5G, Fixed Wireless Access (FWA), line-of-sight microwave, and hybrid technologies.
We work with construction companies across the UK including Bovis Homes, Redrow, United Utilities and the NHS, designing and deploying connections that hold up through every phase of a project.
- Site offices and welfare cabins
- VoIP phones and office communications
- CCTV and remote monitoring systems
- Cloud-based project management and BIM tools
- Contractor and supplier coordination
- Temporary compounds and changing work areas
Why construction sites struggle with WiFi (and how we fix it)
Poor connectivity on construction sites is not inevitable. The causes are predictable, and with the right setup, every one of them is fixable.
-
No fixed line available
Many sites begin before fibre or fixed broadband is live. We provide fast wireless alternatives that get teams online without long lead times or waiting weeks for a provider.
-
Remote or difficult locations
Housing developments, utility works and infrastructure projects often need connectivity in areas where traditional broadband coverage is limited or unavailable. We deploy 4G/5G, FWA and satellite to reach any site.
-
Multiple systems on one connection
Modern sites depend on broadband for CCTV, cloud software, VoIP, health and safety reporting and daily supplier coordination, all at the same time. Our commercial hardware handles it all with traffic prioritisation.
-
Temporary compounds and changing layouts
Your network needs to be flexible enough to move and scale as cabins, access points and active work areas shift throughout the project lifecycle. Our solutions are designed to adapt without service interruption.
-
Pressure to stay operational
Delays caused by poor connectivity affect communications, reporting, security systems and overall programme delivery, all of which have direct cost implications. Downtime is not an option.
-
Need for support, not just hardware
Construction teams need a provider that can advise, deploy and actively support a working solution, not just drop off a router and leave. We monitor your connection remotely and are available 24/7.
Designed for every part of the site
Our construction site broadband solutions cover every operational area, from the first day on site through to practical completion.
Site Offices and Welfare Cabins
Keep project managers, engineers and admin teams connected to cloud platforms, email, project drawings, Procore, Autodesk and reporting tools throughout the build. Welfare cabins get dependable WiFi so the team stays connected between tasks.
CCTV and Site Security
Enable remote CCTV monitoring, cloud footage storage and connected access control systems. Keep the site secure around the clock without relying on a physical presence. Our connections are built to handle continuous video streams alongside other site systems.
Remote and Rural Developments
Deliver fast broadband in rural or newly developed areas where fibre infrastructure is unavailable, delayed or months away from being live. We deploy 4G/5G, Fixed Wireless Access and satellite broadband to reach sites in any location across the UK.
Temporary Compounds
Support changing site layouts with flexible internet infrastructure that can be adapted and relocated as the project progresses, without service interruption.
Renovation and Refurbishment
Get temporary internet in place quickly for live buildings undergoing phased works, where operational continuity is critical and disruption to existing occupants must be minimised.
Utility and Infrastructure Works
Keep field teams, monitoring systems and reporting tools connected on utility and infrastructure projects where sites are spread across wide geographic areas.
Connectivity options tailored to your site
The right solution depends on your site location, signal availability, timescales and how the network will be used. We recommend the best-fit technology for your project rather than a one-size-fits-all product.
4G / 5G Broadband
Rapid to deploy and ideal for temporary construction sites where speed, flexibility and minimal infrastructure matter most. External antennas can significantly boost signal strength in areas with weaker coverage.
Setup: same day to 48 hours. Speeds: up to 300 Mbps (5G). Contracts: rolling monthly.
Line-of-Sight Wireless
High-speed broadband delivered from a nearby fixed point using directional antennas. A strong option for remote sites where mobile signal is unreliable or where higher, more consistent speeds are required.
Setup: 3 to 5 days. Speeds: up to 1 Gbps. Ideal for: rural and semi-rural sites.
Hybrid Solutions
Combine multiple connectivity sources, 4G/5G, line-of-sight and satellite, for greater resilience, stronger performance and consistent uptime across CCTV, VoIP and cloud systems. Automatic failover keeps you online if one source drops.
Recommended for: sites where downtime has direct cost implications.
Backup Connectivity
Maintain service continuity with secondary links and Low Earth Orbit satellite broadband for sites in the most remote locations where 4G/5G and line-of-sight are not viable options.
Setup: 24 to 48 hours. Ideal for: offshore, highland and deep rural projects.
Not sure which option is right for your site? Request a free site assessment and we will run a coverage check for your specific postcode.
How we get your site connected
Brief
We learn about your site, timeline, layout and which systems need to stay connected throughout the project.
Assess
We assess signal coverage for your specific postcode and recommend the best-fit technology for speed, resilience and practical installation.
Deploy
Equipment is configured and installed for your site offices, cabins, CCTV or wider network coverage, typically within 48 hours.
Support
We monitor and support the solution remotely, with expert UK-based help available 24/7 whenever your connectivity needs change.
Adapt
As the project evolves the setup can scale, move or be upgraded to match new layouts, phases and operational priorities.
Construction site broadband vs fixed line and basic hotspot devices
Traditional fixed-line broadband can take weeks or months to install, far too slow for a live construction environment. Consumer hotspot devices may seem convenient, but they typically lack the range, resilience and managed support that professional site operations require.
| Feature | Fixed Line | Mobile Hotspot | Click Telecom |
|---|---|---|---|
| Deployment Time | 4 to 5 days average | Same day | 24 Hours |
| Contract Length | Rigid: 12 months | Pay as you go | Flexible: Rolling Monthly |
| Speed | 1 source: restricted | Limited | Multiple sources: higher speeds |
| Site Coverage | Single entry point | Very limited range | Whole site |
| Data | Various caps | Capped | Unlimited usage |
| Managed Support | None | None | 24 Hour Support |
| CCTV Ready | Possible | No | Yes |
| Scalable | No | No | Yes |
Trusted by construction and utilities businesses across the UK
“We have used Click for multiple sites, meaning all our staff can operate at full capacity on location and their service has enabled us to meet the hand over deadlines for each property.”
Case studies
-
ACS Construction, a leading UK-based construction firm, was awarded a 12-month contract to refurbish and fit out a college in London. From day one, the site required robust, fast, and reliable construction site internet connectivity for project management software, on-site communications, remote file access, and VoIP calling.Read case study -
Bulb Interiors
To overcome the challenges of the university laboratory re-fit, we implemented a comprehensive internet solution. A dual-SIM commercial system was deployed to provide general office internet access, with multiple access points strategically placed to ensure coverage across the site.Read case study -
Community Eye Care (CHEC)
Faced with the urgency of maintaining communication and data access across their sites, CHEC sought the expertise of Click Telecom to implement emergency internet solutions.Read case study
What our customers say
Rated 5 stars by construction teams, site managers and project directors across the UK.
Construction site internet: frequently asked questions
How quickly can construction site internet be installed?
Can you provide internet for remote or rural construction sites?
What can construction site WiFi be used for?
Do I need a long-term contract?
Can the internet solution move as the site changes?
Does construction site internet require a fixed telephone line?
What is the best internet option for a construction site?
Will construction site WiFi work across multiple cabins or large compounds?
Is 4G or 5G enough for a construction site?
How much does construction site internet cost?
Helpful guides for construction site connectivity
-
What is Line of Sight Internet?
Read GuideLine of sight internet is a type of internet connection that is transmitted using radio waves or microwaves. Unlike traditional broadband options, line-of-sight internet doesn’t require any cables to function, making it a popular alternative solution. The name ‘line of sight’ refers to the technology needing an unobstructed line from the transmission point to the […]
-
Construction site security: The ultimate guide
Read GuideSecurity is one of the biggest threats for construction sites, with the cost of theft reaching an estimated £800M a year. Expensive equipment and materials make construction sites a popular target for burglaries, but they’re also at risk of vandalism, cyberattacks and other security breaches. Treating security as a priority is essential for ensuring the […]
-
How to create a construction communication plan
Read GuideCommunication is sometimes overlooked in construction projects, but it plays a vital role in keeping projects on track and teams aligned. Unlike office-based staff, construction workers spend most of the day away from a screen — which means communication requires deliberate planning rather than assumed infrastructure. When information can’t be shared quickly and effectively, delays […]
Need fast, reliable construction site internet?
Talk to our team about a fully managed solution for site offices, CCTV, welfare cabins and temporary compounds. We will recommend the right setup for your site and timeline.
- Free site assessment and coverage check
- Response within 2 hours during business hours
- Deployed in as little as 48 hours
- No long-term contracts required
Need internet urgently?
Speak to our team now. We can often deploy within 24 to 48 hours.
"*" indicates required fields